![The Howard-Tilton Memorial Library construction nears completion on and the removal of the cranes is expected.](https://tulanehullabaloo.com/wp-content/uploads/2014/09/adb248fcbd08cd64f63d8ca7c785d65d-900x598.jpg)
Howard-Tilton Memorial Library crane to be disassembled
Franny Hocking, Associate News Editor
• September 24, 2014
![The previously uninhabited second floor of Flower Hall is being designed to house the SISE undergraduate minor by architecture students.](https://tulanehullabaloo.com/wp-content/uploads/2014/09/5ec0e5f2035204abda6a18cd2da78d4a-900x600.jpg)
Student designs Flower Hall second floor to house SISE minor
Luisa Venegoni, Staff Reporter
• September 10, 2014
Tulane Catholic Center hosts groundbreaking for new, innovative building
Amanda Verdi, Staff Reporter
• September 10, 2014
Barbara Greenbaum House at Newcomb Lawn officially dedicated Saturday
Robert Marchini, Staff Reporter
• September 7, 2014
![The renovations to the third floor of the student health center are nearly finished and the floor will reopen Friday.](https://tulanehullabaloo.com/wp-content/uploads/2014/08/a4f60a4ddcc6462e29b9e8414ff1d2f3-803x900.jpg)
Third floor of Student Health Center to reopen Friday after renovations
Mina Kaji, Contributing Reporter
• August 27, 2014
![The groundbreaking of the new Father Val A. McInnes, O.P., Center for Catholic Life will be held on Sept. 7.](https://tulanehullabaloo.com/wp-content/uploads/2014/08/9858527996a0279c6a0c9f3d5f86470d.png)
Tulane Catholic Center to hold groundbreaking for new building
Armando Marin, Online News Editor
• August 27, 2014
![Yulman Stadium unveils state of art facilities, amenities](https://tulanehullabaloo.com/wp-content/uploads/2014/08/f7d30c6be1f1276dca912c9ffa054b9b-900x511.jpg)
Yulman Stadium unveils state of art facilities, amenities
William Potts, Contributing Reporter
• August 21, 2014
![The interior and exteriors of Greenbaum house are still under construction as students begin to move into the resident hall.](https://tulanehullabaloo.com/wp-content/uploads/2014/08/027fc7d220bda9a1490a76a90bd6c181-900x675.jpg)
Barbara Greenbaum House at Newcomb Lawn opens for residents despite continuing construction
Angelica Nahalka, Contributing Reporter
• August 21, 2014
![The Newcomb College Institute house is located at 44 Newcomb Blvd. The demolition of the building to make way for a four-story dining and office complex has been postponed after the university withdrew its demolition permits.](https://tulanehullabaloo.com/wp-content/uploads/2014/08/b89ce4d7ada4eb86a12ed3cbfa2e381b-900x600.jpg)
Administration considers future of Newcomb College Institute house
Maricela Murillo, Contributing Reporter
• August 21, 2014
![](https://tulanehullabaloo.com/wp-content/uploads/2014/04/49be75941153b85877a02ff44ba049f9-900x600.jpg)
Cowen announces new residence halls, dining hall
Armando Marin and Brandi Doyal
• April 17, 2014
Load More Stories
flytedesk: Box (In-Story)
flytedesk (In-Story | Box)
flytedesk (Sidebar | Half Page)